Voltage Fluctuations and Flicker (John Wiley & Sons, Ltd)

Author: Araceli Hernández Bayo

Source: Handbook of Power Quality Edited by Angelo Baggin, John Wiley & Sons, Ltd

1.0) EVALUATION OF THE CONNECTION OF A THREE-PHASE WELDING MACHINE

This example shows a study of flicker prediction based on simplified assessment methods oriented at evaluating the connection of a new fluctuating load to an existing network.

Figure 1 shows the diagram and data of the 15 kV supplying network. An industrial customer using a large welder (called W1 in Figure 1) has requested the connection of an additional welding machine to increase production capacity. The aim of the study is to decide on the connection of this new load bearing in mind that the Pst planning level of the utility for MV systems is 0.9.

As can be observed, the MV line feeding the disturber client is also feeding other loads (consumer 2) which are residential and office-building consumers considered as non­disturbers (i.e. as non-fluctuating loads). Consumer 1, connected at the point indicated as PCC1, also has non-fluctuating loads.

Different flicker measurements have been performed in order to identify the background flicker levels at PCC2 and the flicker contribution of the already operating welder 1. By these measurements, it has been observed that, when welder 1 does not operate, the background short-term flicker severity at PCC2 is 0.30. When welder 1 is running, the flicker severity level at PCC2 is 0.67.

Figure 1 Schematic diagram of the supplying network under study

Figure 1 Schematic diagram of the supplying network under study

The new welding machine whose connection is under study has the following characteristics:

  • The power absorbed during the melting phase of the welding operation can reach 1800 kVA with a power factor of 0.85. The power absorbed during two welding periods is negligible.
  • The dwell time is 1.5 s and the repetition time is 3 s; that is, welding periods last 1.5 s and are followed by 1.5 s of no load. Therefore, 20 welding operations are performed per minute, which mean 40 voltage changes per minute.

The duty cycle of both welders is around 30 minutes per hour. Therefore, this study will focus on the analysis of short-term flicker severity, Pst, as it will be a stronger requirement than Plt.

The study is organized in the following steps:

  1. Calculation of flicker severity caused at PCC2 by welding machine 1.
  2. Calculation of the voltage change caused at PCC2 by the connection of the welding machine under study (W2).
  3. Estimation of the flicker severity caused at PCC2 by welding machine 2.
  4. Summation of the Pst caused at PCC2 by the simultaneous operation of both machines.
  5. Analysis of solutions.

1.1) Flicker Severity Caused at PCC2 by Welding Machine 1

The Pst level caused by the individual operation of welder 1 can be estimated by means of the measurements performed at PCC2 when the welding machine is working, PstPCC2withW1, and when the welder is not working, PstPCC2withoutW1. Assuming that the disturbance created by the welder and the disturbance introduced by the background level are unrelated disturbances, a cubic summation law can be used to make this estimation:

Voltage Fluctuations and Flicker 2

Pst1 is the flicker severity contribution of welder 1 to the global Pst level at the point of connection PCC2.

1.2) Voltage Change Caused by the New Welder

Before calculating the voltage change caused by the operation of the welding machine, it is necessary to determine the source impedance at the point of common coupling of this equipment. This is done by means of the following calculations:

• Source impedance. As indicated in Figure C5.1, the short-circuit power of the network in 66 kV is 600 MVA. Therefore, the source impedance expressed on the 15 kV side is

Voltage Fluctuations and Flicker 3

A ratio of 30 will be assumed between the reactive and the resistive part of the source impedance. Therefore, the complex form of the source impedance is

Voltage Fluctuations and Flicker 4

• HV/MV transformer impedance. The transformer has a rated power of 50 MVA, an inductive impedance of 10 % and a resistive impedance of 0.8 %. Therefore the transformer impedance is calculated as

Voltage Fluctuations and Flicker 5

• MV line impedance. The resistance of the underground MV cable is 0.125 i/km and the reactance is 0.104 i/km. The length of the line is 2.5 km. Therefore, the complex impedance of this line is

Voltage Fluctuations and Flicker 6

Therefore, the total impedance at PCC2 is

Voltage Fluctuations and Flicker 7

This value implies that a short-circuit power of approximately 200 MVA is available at PCC2. The analyzed additional welder causes power variations of 1800 kVA which represent 0.9 % of this short-circuit power. This is a value high enough to require a detailed evaluation of the flicker emission levels introduced by this additional load.  At this rate of voltage variations per minute, Technical Report IEC 61000-3-7 proposes a ratio of 0.2 % between the power variation of the load and the short-circuit power for approving the connection of the load to an MV system without any further analysis.

Active and reactive power variations (!P and !Q) caused by the additional welding machine can be calculated by making use of its known characteristics, namely the apparent power variation (1800 kVA) and the power factor (0.85). The voltage change produced by welding machine 2 at PCC2 can be calculated by applying Equation (5.12) as follows:

Voltage Fluctuations and Flicker 8

1.3) Estimation of the Flicker Severity Caused by Welding Machine 2

The repetition rate of the voltage changes caused by the welding machine is, as previ­ously indicated, 40 voltage changes per minute. Entering this value into the severity curve (Figure C5.2) for rectangular steps produces on the ordinate the voltage change do ≈0.9 (%) which leads to Psto=1.

Figure 2 Rectangular voltage variation for Pst = 1

Figure 2 Rectangular voltage variation for Pst = 1

Taking into account that short-term flicker severity is a linear parameter with respect to the magnitude of the voltage change that causes it, the expected Pst2 caused by the individual contribution of welder 2 for the voltage change calculated in (C5.9) isVoltage Fluctuations and Flicker 10

The expected Pst can also be calculated by means of the analytical approach presented in the publication IEC 61000-3-3 [1] that was discussed in Section 3.3. This method is based on calculating the flicker time, tf, by means of the following expression:

Voltage Fluctuations and Flicker 11

In this case, since voltage changes are rectangular, factor F is one unit. Therefore

tf = 23 07132 = 0769 s (C5.12)  manque celui-ci

Pst is determined by summing all the flicker times, tf, inside a 10 min time interval, Tp. Considering that 40 voltage changes occur per minute, i.e.Voltage Fluctuations and Flicker 12

the value of Pst2 calculated by means of this method is very close to the value obtained by means of the flicker curve, although a slight difference appears between them. This difference can be understood by bearing in mind that both approaches, although providing reasonable estimates, are based on simplifications.

1.4) Pst Caused by the Simultaneous Operation of Both Machines

In order to obtain the total flicker severity at point PCC2, the individual contribution of each disturbing load connected to this point (Pst1 and Pst2) together with the background flicker level (PstPCC1withoutW1), must be considered.

Therefore, assuming that the operation of both welders is uncorrelated, the summation law described in Section 5.3.3 can be applied with a coefficient m = 3. This assumption ignores the more severe flicker which would result from the coincidence of steps from different welders. In this case, since welding cycles last 3 s, this can be an acceptable assumption. Therefore, the global flicker emission at PCC2 is equal to

Voltage Fluctuations and Flicker 14

This value exceeds the utility planning level (Pst = 0.9) and, therefore, it is not tolerable. The connection of the additional welder machine is unacceptable, unless mitigation methods are provided.

1.5) Analysis of Solutions

A possible solution is to install a compensator device to reduce flicker emission of the welders. Another possibility is to reinforce the short-circuit power at the point of connection of the welders by building a new line. Although this can be an expensive solution, the technical analysis presented next shows the improvement achieved by means of this solution.

If a new underground cable, identical to the existing one, is connected in parallel with it between PCC1 and PCC2, the short-circuit power at PCC2 is increased. The new impedance of the equivalent parallel of both lines is

Voltage Fluctuations and Flicker 15

Therefore, the new total impedance at PCC2 is

Voltage Fluctuations and Flicker 16

The available short-circuit power at PCC2 is now 230 MVA.

Both welders have a power factor of 0.85 in the welding periods. Therefore, considering (C5.9), the ratio between the voltage changes caused in this new network configuration and the previous one is

Voltage Fluctuations and Flicker 17

This result implies that in this new situation, the Pst level caused by the individual contri­bution of each welder will be decreased by a ratio of 0.77. Assuming that consumer 2 connected at PCC2 is a non-disturber consumer, the background flicker level existing at PCC2 is propagating from the upstream voltage level and, therefore, it is not modified by the addition of the new line. Therefore, the new value of flicker severity is

Voltage Fluctuations and Flicker 18

The Pst level obtained by applying this solution is below the planning level, so this proposal is acceptable. It is important to note that this analysis is made using the assumption that the welders are the only fluctuating loads connected at the MV busbars.

An alternative approach for determining the individual emission limits of these welders could be based on calculating the quotient between their rated power and the total power of the loads directly supplied to the MV network. In such an analysis, the total flicker level acceptable at PCC2 should be shared between all the connected loads in proportion to their rated power.2

Nevertheless, in the situation analyzed in this case study, since consumer 1 and consumer 2 are non-fluctuating loads, this kind of approach would give place to very strict limits for the disturbing loads imposing flicker levels unnecessarily far below the planning levels. Therefore, under these circumstances, a more flexible method for assessment of individual limits has been applied, although it is convenient to bear in mind that future arrangements or changes in the flicker contributions of the connected customers should be carefully analyzed.  This evaluation criterion is known as ‘Stage 3’ in the context of Technical Report IEC 61000-3-7.

2.0) FLICKER MEASUREMENTS IN AN ARC FURNACE INSTALLATION

Arc furnaces are very fluctuating loads that produce stochastic flicker. The random nature of voltage fluctuations caused by arc furnaces complicates the use of simplified flicker prediction methods. A measurement campaign is a more precise way to assess flicker levels produced by this type of load.

This case study presents the Plt measurements that have been performed over several days in the arc furnace installation depicted in Figure 3. This installation is connected to a 110 kV network through a three-winding transformer whose data is indicated in Figure 3. The flicker measurements were performed over several days at the MV side.

Figure 4, Figure 5 and Figure 6 show the evolution of Plt at phase A, B and C, respectively, measured at the MV busbar.

Table 1 shows the main statistics of the Plt values measured at three phases over a week.

The Plt caused at buses upstream in a grid is reduced reciprocally to the increasing short-circuit power. According to the percent reactance values of the transformer of this installation, the available short-circuit power on the MV side, where the measurements have been carried out, is around 20 times lower than the short-circuit power available on the HV side of the transformer. Therefore, a reduction in the flicker-level emission of the arc furnace with a ratio of 20 can be expected on the HV side with respect to the values indicated in Table C5.1. This situation leads to acceptable flicker levels in the PCC.

Figure 3 Schematic diagram of the arc furnace installation

Figure 3 Schematic diagram of the arc furnace installation

Figure 4 Plt evolution (phase A) at the MV bus of the arc furnace installation (Courtesy of Prof. Zbigniew Hanzelka)

Figure 4 Plt evolution (phase A) at the MV bus of the arc furnace installation (Courtesy of Prof. Zbigniew Hanzelka)

Figure 5 Plt evolution (phase B) at the MV bus of the arc furnace installation (Courtesy of Prof. Zbigniew Hanzelka)

Figure 5 Plt evolution (phase B) at the MV bus of the arc furnace installation (Courtesy of Prof. Zbigniew Hanzelka)

 Figure 6 Plt evolution (phase C) at the MV bus of the arc furnace installation (Courtesy of Prof. Zbigniew Hanzelka)

Figure 6 Plt evolution (phase C) at the MV bus of the arc furnace installation (Courtesy of Prof. Zbigniew Hanzelka)
Voltage Fluctuations and Flicker 23

Table 1 Statistics of measured Plt values

BIBLIOGRAPHY

[1] Ashmole P., Quality of supply – voltage fluctuations. Part 2. Power Engineering Journal, April, pp. 108–117, 2001.

[2] Garcia-Cerrada A., Garcia-Gonzalez P., Collantes R., Gomez T., Anzola J, Comparison of thyristor-controlled reactors and voltage-source inverters for compensation of flicker caused by arc furnaces. IEEE Transactions on Power Delivery, vol. 15, no. 4, pp. 1225–1231, 2000.

[3] Hanzelka Z. et al., Comparative tests of flicker meters. Proceedings of CIRED. 17th International Conference on Electricity Distribution, Barcelona Spain, 12–15 May 2003. Technical Reports, Session 2, Paper no. 25, pp. 1–5.

[4] Hernandez A., Mayordomo J. G., Asensi R., Beites L. F., A new frequency domain approach for flicker evaluation of arc furnaces. IEEE Transactions on Power Delivery, vol. 18, no. 2, pp. 631–638, 2003.

[5] IEC 868, Flickermeter. Functional and design specifications, 1986.

[6] IEC 61000-4-15 (1997–11), Electromagnetic compatibility (EMC) – Part 4: Testing and measure­ment techniques – Section 15: Flickermeter – Functional and design specifications.

[7] IEC 61000-4-15-am1 (2003–01), Amendment 1 – Electromagnetic compatibility (EMC) – Part 4: Testing and measurement techniques – Section 15: Flickermeter —-Functional and design specifications.

[8] IEC 60050 (161), International Electrotechnical Vocabulary (IEV) – Chapter: Electromagnetic compatibility.

[9] IEC 61000-3-7 (1996–11), Electromagnetic Compatibility (EMC) – Part 3: Limits – Section 7: Assessment of emission limits for fluctuating loads in MV and HV power systems.

[10] IEC 61400-21 (2001–12), Part 21: Measurement and assessment of power quality characteristics of grid connected wind turbines.

[11] IEC 61000-3-3 (1994-12), Electromagnetic compatibility (EMC) – Part 3-3: Limits – Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤16 A per phase and not subject to conditional connection.

[12] IEC 61000-3-5 (1994–12), Electromagnetic compatibility (EMC) – Part 3: Limits – Section 5: Limitation of voltage fluctuations and flicker in low-voltage power supply systems for equipment with rated current greater than 16 A.

[13] IEC 61000-3-11 Ed. 1 (2000–08), Electromagnetic compatibility (EMC) – Part 3: Limits – Section 11: Limitation of voltage changes, voltage fluctuations and flicker in low-voltage power supply systems. Equipment with rated current ≤75 A and subject to conditional connection.

[14] IEC 61000-4-30 Ed. 1 (2003–02), Electromagnetic compatibility (EMC) – Part 4-30: Testing and measurement techniques – Power quality measurement methods.

[15] Larsson T. and Ekstrom Å., A PWM-operated voltage source converter for flicker mitigation. European Power Electronics Conference ’97, Vol. 3, pp. 1016–1020, September 1997.

[16] De Lange H., Experiments on flicker and some calculations on an electric analogue of the foveal system. Physica, vol. 18, pp. 935–950, 1952.

[17] De Lange H., Eye’s response at flicker fusion to square-wave modulation of a test field surrounded by a large steady field of equal mean luminance. Journal of the Optical Society of America, vol. 51, pp. 415–421, 1961.

[18] Mayordomo J. G., Prieto E., Hernández A., Beites L. F., Arc furnace characterization from an off-line analysis of measurements. Proceedings. Ninth International Conference on Harmonics and Quality of Power, 1–4 October 2000, Vol. 3, pp. 1073–1078, 2000.

[19] Mendis S. R., Bishop M. T., Witte J. F., Investigations of voltage flicker in electric arc furnace power systems. Industry Applications Society Annual Meeting, Denver, October, Vol. 3, pp. 2317–2325, 1994.

[20] Mombauer W., Calculating a new reference point for the IEC-Flickermeter. European Transac­tions on Electrical Power, vol. 8, no. 6, pp. 429–436, 1998.

[21] Montanari G. C., Loggini M., Pitti L., Tironi E., Zarinelli D., The effects of series inductors for flicker measurement in electric power systems supplying arc furnaces. Industry Applications Society Annual Meeting, 2–8 October 1993, Conference Record, Vol. 2, pp. 1496–1503, 1993.

[22] Rashbass C., The visibility of transient changes of luminance. Journal of Physiology, vol. 210, pp. 165–186, 1970.

[23] Reed G. F., Greaf J. E., Matsumoto T., Yonehata Y., Takeda M., Aritsuka T., Hamasaki Y., Ojima F., Sidell A. P., Chervus R. E., Nebecker C. K., Application of a 5 MVA, 4.16 kV D-STATCOM system for voltage flicker compensation at Seattle Iron and Metals. IEEE Power Engineering Society Summer Meeting, July, Vol. 3, pp. 1605–1611, 2000. Schauder C., STATCOM for compensation of large electric arc furnace installations. IEEE Power Engineering Society Summer Meeting, July, Vol. 2, pp. 1109–1112, 1999.

[24] Simons G., Das Flackern des Lichtes in elektrischen Beleuchtunganlages. ETZ, no. 37, pp. 453–455, 1917.

[25] UIE (Union Internationale d’Electrothermie), Flicker Measurement and Evaluation, Technical Report, Second Edition, 1991.

[26] UIE (Union Internationale d’Electrothermie), Connection of Fluctuating Loads, Technical Report, 1988.

[27] UIE (Union Internationale d’Electrothermie), Connection of Fluctuating Loads, Technical Report, 1988.